Client: PanGeo Subsea

Fabrication of Three ROGE System Bracket and Assemblies within a tight time schedule. 

  • Sourcing and supply of all materials
  • MPI and Ultrasonic Inspection
  • Load testing
  • Shot blasting and painting
  • Transportation and delivery to customer

Client feedback:

"just to say and underscore what a fantastic service and notable excellent quality your company provided to us during a recent challenging call off contracted campaign for the Largest Operators in the Southern North Sea (Perenco)

We can confirm that all the ROGE System Fabricated Brackets and Assemblies (3 off) which we required for the critical interface features on our Sub Bottom Imager, all fitted up at the first time of trying on the chosen Vessel, and operationally we are pleased to report a 100% all round success.

We firmly believe that this level of success would simply have been neither recorded nor possible, without the dedication and input from your Managerial staff and Skilled Workforce alike.

Please be assured that we will have no hesitation in recommending your company for any similar likeminded challenges, both within our company and beyond." 

 

 

image003
IMG 20150122 WA0000
IMG 20150122 WA0003
IMG 20150122 WA0006